Concrete Pumping Safety

Hose blowouts and hose whipping are serious hazards that can cause injuries while workers are pumping concrete.

Air trapped in a delivery line can cause hose blowouts and/or hose whipping. When the air is released, the end of the hose can whip and cause injury to workers in the area. Air in the delivery system itself is not the hazard. But when that air becomes compressed due to a blockage, it stores energy. The risk of a hose blowout or hose whipping happens when that energy discharges.

To minimize the risk during concrete pumping work, ALL personnel should be cautious and maintain a reasonable distance from the discharge hose when:

  • Restarting equipment after moving.
  • Priming the equipment.
  • There is air in the delivery line.
  • There is a blockage.

Establish a controlled-access zone around the pumping area to eliminate the potential of the hose striking a worker in case it gets away from the operator.

If you encounter a blockage, move the boom away from the pour to a safe location and re-establish flow before moving the boom back to the pour.

Additional safety measures include:

  • Ensure the pump operator has inspected the delivery pipe, and it isn’t cracked or worn.
  • Maintain visual contact with the operator or signal person.
  • Use a single-ended hose on the discharge.
  • Use guide/tag lines to guide the hose while pumping. Do not hug the hose.
  • Do not place yourself between the hose and a fixed object.
  • Maintain a 20-foot minimum approach distance from all overhead, energized, uninsulated powerlines with voltages of 0.1kV to 350kV.
  • For voltages exceeding 350kV, the minimum approach distance is 50 feet.

Download a printable PDF and recording form here. 

View the Latest Facebook News

Indiana Constructors, Inc.
Indiana Constructors, Inc.2 days ago
Some came for the golf. Some came for the networking. Some came armed with questionable swing mechanics and tremendous confidence.

Whatever brought them out, industry friends filled both courses at the 2026 ICI Golf Classic for a beautiful day at Pebble Brook. Browse a few highlights here, then head over to the Greg Kicinski Photography gallery for all the incredible team and action shots.

https://gregkicinskiphotography.pixieset.com/iciannualgolfouting2026/

#letsbuildIN #letsbuildINtogether
Indiana Constructors, Inc.
Indiana Constructors, Inc.4 days ago
The South Bend Cubs knocked it out of the park with a 5-2 win over the Wisconsin Timber Rattlers at Four Winds Field in South Bend last night. Who else won? ITT members who gathered for their summer social! Thank you to sponsors Butler Fairman & Seufert, Haulz Software, Rieth-Riley Construction and Superior Construction. They are the true MVPs ⚾ #indianatransportationteam #letsbuildINtogether 📷 ICI photo/Richard Hedgecock, CAE
Indiana Constructors, Inc.
Indiana Constructors, Inc.5 days ago
The 2026 ICI Golf Classic is underway! Thanks to everyone joining us for a day of golf, networking and supporting the Work IN Roads foundation.
#letsbuildin
Indiana Constructors, Inc.
Indiana Constructors, Inc.5 days ago
It's a full crew for the 2026 ICI Golf Classic in Noblesville tomorrow. Shoutout to all our sponsors who support the outing and the Work IN Roads foundation. #letsbuildin